Insulation Outside Girts - New Wall Application

Installation Instructions

  • Staple the InfraStop® double bubble insulation to the outside of the top girt.
  • Staple the insulation to the outside of the remaining girts. Insure there is a drape of at least 3/4″ (towards the interior of the building) at the center of each cavity./p>
  • Tape the seams with InfraStop® Foil Tape (goal is an air-tight, snug seam seal.)
  • Attach outside panel.
  • Atach interior panel to the inside of the girts (if specified).

Thermal Insulation

Metal Interior – R-5.5 Heat Flow Horizontal

Open Interior – R-4.7* Heat Flow Horizontal

*Includes thermal resistance of 1.70 interior air film.

Product Information

InfraStop® Insulation products are a group of technologically advanced materials. They are ideal for new construction or retrofit applications in commercial, industrial, metal and post/frame buildings, along with many other DIY applications. When you think of insulation, you should think of InfraStop®. Our products are recognized for their thermal performance, easy installation, versatility, price and environmental friendliness.

Benefits

  • Easy to handle and install
  • Convenient roll sizes
  • Class A / Class 1 Fire Rating
  • Inhibits dew point condensation
  • Vapor retarder (0.02 perms)
  • Does not compress, collapse or disintegrate
  • Non-toxic / non-carcinogenic

Testing and Certification

InfraStop® products are thoroughly tested at either nationally approved independent laboratories or leading universities. Tests are performed to current American Society of Testing and Materials (ASTM) standards when a standard exists. For a copy of an actual test report, please e-mail us at customer.support@insulationstop.com.