Items in cart: 0    Total: $0.00
(518) 339-5510
Shop Navigation:
Special Offers
Newsletter
Newsletter
 

Post Frame Building - White Roof Retrofit - Bottom of Purlin

Post Frame Retrofit Roof White Below PurlinsPost Frame Building - Product: Reflective One Side

 

Below the Purlins: Open Interior
R-6.4* Heat Flow Down | R-3.7* Heat Flow Up

* Includes thermal resistance of 0.61 UP and 0.92 DOWN for interior air film.

Calculation Disclaimer: All values are calculated based on the "ASHRAE Handbook of Fundamentals". Heat flow up and down

Tempshield™ Insulation products are a group of technologically advanced materials. They are ideal for new construction or retrofit applications in commercial, industrial, metal and post/frame buildings, along with many other DIY applications. When you think of insulation, you should think of Tempshield™. Our products are recognized for their thermal performance, easy installation, versatility, price and environmental friendliness.

Standard Size Recommended Products:

Custom Size Recommended Products:

Benefits:

  • Easy to handle and install
  • Convenient roll sizes
  • Class A / Class 1 Fire Rating
  • Inhibits dew point condensation
  • Vapor retarder (0.02 perms)
  • Does not compress, collapse or disintegrate
  • Non-toxic / non-carcinogenic

Testing and Certification:

Tempshield™ products are thoroughly tested at either nationally approved independent laboratories or leading universities. Tests are performed to current American Society of Testing and Materials (ASTM) standards when a standard exists. For a copy of an actual test report, please e-mail us at customer.support@insulationstop.com.

Air Space Requirements:
Post Frame Building Air Space Requirements

Installation Instructions:
Post Frame - White Retro Roof - Bottom of Purlin Installation Instruction

  • The Tempshield™ Insulation is installed with the “white side” towards the interior of the building.
  • Inspect the roof area for clutter in buildings where there is no ceiling.
  • Measure the distance between the trusses. Many times, the distance will be 4’ or less. In some geographical areas, due to snow load, the distance will be as close as 2’.
  • Cut pieces of the Tempshield™ Reflective/Bubble/Bubble/White Insulation 6” longer than the distance between the ridge pole and the bird’s mouth.
  • Staple the product to the bottom of the purlins with 5/16” staples, 3” to 4” apart. Turn the edges down and staple to the side of the top cord of the trusses.
  • Staple the top of the insulation to the ridge pole and the bottom to the top plate at the wall.
  • Tape any butt seams with Reflectix™ Foil Tape. Make sure the tape is applied so that a proper bond occurs.

Important: Review These Important Safety Guidelines Prior to Installation.