Items in cart: 0    Total: $0.00
(518) 339-5510
Shop Navigation:
Special Offers
Newsletter
Newsletter
 

Post Frame Building - New Wall

Post Frame New Wall Inside GirtProduct: Reflective Both Sides

 

Inside the Girts: Metal Interior
R-6.3 Heat Flow Horizontal


Inside the Girts: Open Interior
R-5.3* Heat Flow Horizontal

Outside the Girts: Metal Interior
R-5.5 Heat Flow Horizontal

Outside the Girts: Open Interior
R-4.7* Heat Flow Horizontal

* Includes thermal resistance of 1.70 interior air film.

Calculation Disclaimer: All values are calculated based on the "ASHRAE Handbook of Fundamentals".Post Frame New Wall Outside Girt

Tempshield™ Insulation products are a group of technologically advanced materials. They are ideal for new construction or retrofit applications in commercial, industrial, metal and post/frame buildings, along with many other DIY applications. When you think of insulation, you should think of Tempshield™. Our products are recognized for their thermal performance, easy installation, versatility, price and environmental friendliness.

Standard Size Recommended Products:

Benefits:

  • Easy to handle and install
  • Convenient roll sizes
  • Class A / Class 1 Fire Rating
  • Inhibits dew point condensation
  • Vapor retarder (0.02 perms)
  • Does not compress, collapse or disintegrate
  • Non-toxic / non-carcinogenic

Testing and Certification:

Tempshield™ products are thoroughly tested at either nationally approved independent laboratories or leading universities. Tests are performed to current American Society of Testing and Materials (ASTM) standards when a standard exists. For a copy of an actual test report, please e-mail us at customer.support@insulationstop.com.

Air Space Requirements:
Post Frame Building Air Space Requirements

Installation Instructions:
Post Frame - New Wall - Installation Instruction

1. Product Inside the Girts

  • Staple the Tempshield™ Reflective/Bubble/Bubble/Reflective, Staple Tab product to the outside of the top girt.
  • Staple the product to the inside of the remaining girts.
  • Tape the seams with a Tempshield™ Foil Tape (goal is an air-tight, snug seam seal).
  • For interior covering, attach 1" x 2" furring strips perpendicular to the girts through the insulation
  • Attach interior panel to the furring strips
  • This will provide a 1" (nominal) air space between the interior panel and the insulation and a 1 1/2" air space between the insulation and the outside panel.

2. Product Outside the Girts

  • Staple the Tempshield™ Reflective/Bubble/Bubble/Reflective, Staple Tab product to the outside of the top girt.
  • Staple the product to the outside of the remaining girts. Insure there is a drape of at least 3/4” (towards the interior of the building) at the center of each cavity.
  • Tape the seams with a Tempshield™ Foil Tape (goal is an air-tight, snug seam seal).
  • Attach outside panel.
  • Attach interior panel to the inside of the girts (if specified).

Important: Review These Important Safety Guidelines Prior to Installation.