Items in cart: 0    Total: $0.00
(518) 339-5510
Shop Navigation:
Special Offers
Newsletter
Newsletter
 

Metal & Steel Building - New Roof

Metal Steel Building New Roof Thermal BreakProduct: Reflective Both Sides



Open Interior with 3/4" Thermal Breaks
R-9.2* Heat Flow Down (and a Radiant Barrier)
R-4.1* Heat Flow Up


Open Interior with 3/4" Thermal Breaks and a Nominal 3/4" Drape
R-7.6* Heat Flow Down (and a Radiant Barrier)
R-3.9* Heat Flow Up


* Includes thermal resistance of 1.32 UP and 4.55 DOWN for interior air film.

Please Note: In addition to the stated R-value, this application also provides a Radiant Barrier. As a result, a 96% reduction of the radiant energy that ordinarily would be transmitted to the interior of the building is blocked.

Tempshield™ Insulation products are a group of technologically advanced materials. They are ideal for new construction or Metal Steel Building New Roof No Thermal Breakretrofit applications in commercial, industrial, metal and post/frame buildings, along with many other DIY applications. When you think of insulation, you should think of Tempshield™. Our products are recognized for their thermal performance, easy installation, versatility, price and environmental friendliness.

Standard Size Recommended Products:

Custom Size Recommended Products:

Benefits:

  • Easy to handle and install
  • Convenient roll sizes
  • Class A / Class 1 Fire Rating
  • Inhibits dew point condensation
  • Vapor retarder (0.02 perms)
  • Does not compress, collapse or disintegrate
  • Non-toxic / non-carcinogenic

Testing and Certification:

Tempshield™ products are thoroughly tested at either nationally approved independent laboratories or leading universities. Tests are performed to current American Society of Testing and Materials (ASTM) standards when a standard exists. For a copy of an actual test report, please e-mail us at customer.support@insulationstop.com.

Air Space Requirements:
Metal and Steel Building Air Space Requirements

Installation Instructions:
Metal and Steel Building - New Roof - Installation Instruction

1. Open Interior with 3/4" Thermal Breaks

  • After the red metal is erected, install the Tempshield™ Reflective/Bubble/Bubble/Reflective product over the purlins by using 1/2” self-taping metal screws and screwing the product to the purlins.
  • Tape the seams with a Tempshield™ Foil Tape (goal is an air-tight, snug seam seal).
  • Install at least a 3/4” thermal break. If installing a standing seam roof, use clips with thermal breaks.
  • Install roofing either by screwing corrugated metal screws through the thermal break and insulation to the purlin or install a standing seam roof.
  • If an interior finish is to be installed, attach to the bottom of the purlins.
  • This will create a 3/4” air space between the roofing and the insulation and an 8” air space between the insulation and the interior finish.

2. Open Interior with 3/4" Thermal Breaks and a Nominal 3/4" Drape

  • Per instructions above without the thermal break.

Important: Review These Important Safety Guidelines Prior to Installation.